Case Study - Pump Station

Client
Town of La Grange, North Carolina

Project
Dynamic Planning for Comprehensive Wastewater Rehabilitation Project Engineered by The Wooten Company, Mr. Dan Boone, Project Manager.

Location
La Grange, North Carolina

Description
Severe deterioration of the town's sewer system has called for a comprehensive rehabilitation project that included permanent rehabilitation of 224 manholes, 6 pump stations as well as slip-lining of sewer lines, service lateral replacements, sewer line replacement and upgrades to lift stations.

Solution
The Town of La Grange contracted with a Poly-Triplex Certified Installer to complete the manhole and pump station portion of the project. The Poly-Triplex Liner System was used to completely seal off infiltration and provide an impervious water, chemical and sewer gas resistant liner to stop future deterioration.

Benefit
The Town of LaGrange has chosen to rehabilitate it's system in a permanent and comprehensive manner rather than look for cheap short-term quick fixes that have not worked in the past. Infiltration levels have been significantly reduced and deterioration of their system virtually halted.

Case Study

Left - Poly-Triplex Liner is being lowered into place and will be cured-in-place via air pressure and steam heat injection.
Right - Poly-Triplex Liner System has been installed and pump station placed back into service after only 24 hours.

Comments
Mr. Dean Gaster states in The Tarheel Pipeline, "Our hats off to those involved in securing funding for a project of this magnitude as well as those responsible for pulling it all together. The La Grange wastewater collection system should be top-of-the-line and tight-as-a-drum when this dynamic undertaking is completed sometime this year."