Main Page
Contact Us

Case Study
Client: Town of La Grange, North Carolina
Project: Dynamic Planning for Comprehensive Wastewater Rehabilitation Project Engineered by The Wooten Company, Mr. Dan Boone, Project Manager.
Location: L a Grange, North Carolina
Description: Severe deterioration of the town's sewer system has called for a comprehensive rehabilitation project that included permanent rehabilitation of 224 manholes, 6 pump stations as well as slip-lining of sewer lines, service lateral replacements, sewer line replacement and upgrades to lift stations.
Solution: JCB Environmental Services has worked with the Town of La Grange to complete the manhole and pump station portion of the project. JCB has used the Poly-Triplex® Liner Systems to completely seal off infiltration and provide an impervious water, chemical and sewer gas resistant liner to stop future deterioration.
Benefit: The town of LaGrange has chosen to rehabilitate it's system in a permanent and comprehensive manner rather than look for cheap short-term quick fixes that have not worked in the past. Infiltration levels have been significantly reduced and deterioration of their system virtually halted.
Description: Poly-Triplex® Liner is being cured-in-place via air pressure and steam heat injection. Example of Poly-Triplex® Liner System Permanent Manhole Rehabilitation
Comments: Mr. Dean Gaster states in The Tarheel Pipeline, "Our hats off to those involved in securing funding for a project of this magnitude as well as those responsible for pulling it all together. The La Grange wastewater collection system should be top-of-the-line and tight-as-a-drum when this dynamic undertaking is completed sometime this year."

Our Company The Poly-Triplex® Process Industry Comparisons
Licensed Contractors Resource Room Poly-Triplex® Case Studies Contact Us